University Of Waterloo

University of Waterloo: School of Pharmacy Kitchener – Completed 2008

At that time was our largest contract. Extensive fume hood and lab ventilation system complete with welded stainless steel ducts, exhaust air valves and high plume exhaust fans. Supply air provided by variable air volume boxes and decorative linear diffusers.

Kuntz Electroplating Inc. Kitchener

ESM has provided over 20 years of ongoing service to KEI. From custom metal fabrication, machine guarding, dust collection, fume extraction to general office HVAC systems, ESM has done it all at KEI. ESM has also installed many all welded PVC fume exhaust systems which service the plating production lines.

Kitchener Memorial Auditorium

Kitchener Memorial Auditorium Expansion – Completed 2012

An extremely aggressive schedule was the focal point for this project, of which it was met in time for the Kitchener Rangers to open their season in their new facilities. ESM provided HVAC distribution services for the seating expansion, private boxes and Ranger teams rooms. ESM also fabricated and installed all welded kitchen grease ducts for the new concessions and food services.

Winston Park

Winston Park Long Term Care Expansion and Renovation Kitchener – Completed 2024

A new 8 story long term care building coupled with extensive renovations to one of the original buildings. This 3 year long project presented many challenges due to constant changes and the addition of another 3 storys on top of the original 5 story long term care building. Besides VVT distribution air systems for the resident suites, ESM provided new duct and fan systems for the in house laundry services and the expansive kitchen facilities.

256 Philip St Waterloo

256 Philip St Waterloo – Completed 2022

20 story, 106 unit student residence. ESM worked hand in hand with the mechanical contractor to ensure the building was ready for occupancy for the university students in September. ESM provided all duct systems for the suite fan coils including ERV exhaust serving the washrooms and kitchens, along with the numerous student common areas.

Conrad Grebel College

Conrad Grebel College: University of Waterloo – Completed 2024

To say lots of advanced planning and an extremely short installation period were required would be an understatement. The project involved the complete demolition of most of the mechanical room along with the replacement of the existing 12000 cfm multizone air handling unit and central exhaust system. In addition, the specifications called for a new 3000 cfm indoor energy recovery ventilator, variable air volume (VAV) boxes and silencers. The majority of this to be installed in a 10 day shut down window. ESM provided 2 shifts on site as well as continuous shop fabrication support to meet the deadline.